Asana Integration
Connect Asana for task context and set project or workspace limits for Asana actions in Brief.
Connect Asana to use task progress as work context in Brief and ask Brief to work with tasks and projects in your Asana account.
Connect Asana
- Open Integrations and select Connect a Tool….
- Choose Asana, select Done, then select Connect on its row and complete Asana authorization. Brief requests permission to read and change tasks and projects, including delete access, and to read or write comments and tags. It also requests permission to manage webhooks for updates. Brief can perform the supported actions below only within the connected account's Asana permissions and the saved workspace or project selection.
- Under Workspaces to Monitor, select up to 100 workspaces. To narrow actions to particular projects, open Filter by Projects and select up to 100 projects. The project filter appears after you select a workspace.
- Select Complete Setup.
With projects selected, Brief's Asana tools limit project and task actions to those projects. With no projects selected, selected workspaces limit those actions to the workspaces. If you complete setup with neither selected, no workspace or project limit is saved for those tools; the connected account's Asana permissions still apply. Don't share skips background task indexing during setup, but Asana chat tools remain available with the connected account's permissions and no saved workspace or project limit.
Use Configure on the connection to change the selection later, then select Save Changes. When you select projects, Brief saves a project limit instead of a separate workspace limit; the workspace list can still show other workspaces your Asana account can access. An older connection without a saved selection retains its previous tool access. Background task reads use the workspace chosen during authorization. The saved workspace and project selection can filter webhook task updates before they enter the work feed.
What Brief uses
Brief's work feed reads active and completed tasks from the first workspace Asana returned when you connected. It uses task names, completion state, dates, notes, and tags. Completed tasks can contribute to work metrics such as throughput and cycle time. Sections, milestones, and custom fields are not part of this work feed.
Asana's task search requires an Asana Premium workspace. A free workspace may return a payment-required error and prevent task work from syncing. If your account has several workspaces, the work feed may not represent the workspace you selected in setup.
After setup, Brief reads task work in the background. If you select a workspace, Brief attempts to register a webhook for the first one selected. If it finds a project there, it subscribes to that project; otherwise it subscribes to the workspace. Webhook updates may therefore cover only one project or workspace. Your saved workspace and project selection filters received events, while background task reads run separately.
Work with Asana in Brief
In Brief Chat, try "Find active tasks in the launch project" or "Mark the review task complete." With the connected account's permissions and the saved scope, Brief can list and search tasks, read a task, create and update tasks, add comments, tags, or sections, and delete tasks. It can also list, create, and update projects. The task tools can set a name, notes, assignee, and dates; task updates can mark work complete. Project creation requires an allowed workspace and is unavailable when the connection is limited to specific projects.
Common problems
- No tasks enter Brief's work context: Check which Asana workspace was first returned when you authorized Brief. If that workspace is on Asana's free plan, task search may fail with a payment-required error. A project selection in setup does not redirect the work feed to another workspace.
- A workspace or project is missing in setup: Confirm that the authorized Asana account can access it. Select a workspace before opening Filter by Projects; use the search fields to find entries in a long list.
- A task action is denied: Check the saved project or workspace selection under Configure and the connected account's Asana permissions. A project-limited connection cannot create a new project.
- A task change is not visible yet: Background reads and webhook delivery can take time. Confirm the task belongs to the workspace read by the work feed before changing the setup selection.
- The connection needs attention: Use Reconnect on its Integrations row to authorize again. Use Configure when you only need to change the saved selection.
See Set up MCP to use Brief with an agent in your IDE, Connect Notion for documents, Connect GitHub for code work, Browse integrations, and Troubleshoot connections.